Whitby Sports Centre & Swimming Pool

The project was to redevelop the existing swimming pool services and provide a new sports hall, outdoor sports pitch and ancillary activity rooms.

Whitby Leisure Centre

EMCE installed the building electrical services including new fire alarm, emergency lighting, boiler house heating and ventilating controls systems. In house construction installation drawings and cable designs were produced for client acceptance before the project commenced.

The project required close co-ordination with the swimming pool staff and mechanical contractor to maintain the building services during the construction phases to keep the swimming pool operational.

Client: Scarborough Borough Council

Value: £175,000

Main Contractor: Frank Brambles Ltd

Latest News

Yorkshire Coast Colle...

Apr 24, 2010

EMCE have been contracted to upgrade the electrical installation to the 4th Floor of the main teaching block at

READ MORE...

Scarborough Spa ...

Apr 24, 2010

EMCE have been awarded the electrical installation contract for the refurbishment of The Scarborough Spa.

The

READ MORE...